News / Solumat Vinci Construction chooses Giulio Barbieri for their production facilities

Solumat Vinci Construction chooses Giulio Barbieri for their production facilities

The French company Solumat Vinci Construction of Vierzon chose the Ready Box 4 temporary building in order to protect the rail transport of cleaning and painting materials.

Retractable canopy for paint factory plants - Vinci Construction
First of all, the customer expressed their need to protect as far as possible materials being transported form the rain and wind. The project was thus developed with the sliding tracks of the retractable tunnel buried so that the PVC fabric canopy could go right down to the ground, better protecting the internal area, where, with the use of a series of windows in transparent PVC Crystal, natural lighting is ensured. The buried tracks also resolved a secondary requirement, which was that of making the area accessible to vehicles once the tunnel is closed. In the following photo you can see the lean-to connecting tunnels attached to the production facilities, the tunnels are joined in the centre and once closed enable the transit of vehicles.

PRODUCT: Ready Box 4 - n. 2 retractable tunnels with a width of 5.3m, length of 11m and height of 4.5m; n. 1 retractable tunnel with a width of 5.3m, length of 12m and height of 4.5m;

 

Retractable canopy for paint factory plants - Vinci Construction

Retractable canopy for paint factory plants - Vinci Construction

 

Related content
Box 4
Retractable tunnels
Filed under: , , ,